Back

Hybrid Digital Displacement® hydraulic PTO for wave energy


Stage

Stage 2

Project Lead

Artemis Intelligent Power Ltd

Project Sub-Contractors

Quoceant Ltd

The project completed the next stage of work to integrate Artemis Digital Displacement Pump-motor (DDPM) technology into a state of the art Power Take-Off (PTO) system to produce a new ‘hybrid’ with a combined capability greater than the sum of the parts. The highly innovative system offers continuously variable control of loads in reaction to the wave forces on the wave energy converter (WEC). The hybrid system represents a system close to the ultimate limits of performance for a fluid power WEC PTO system. 

PTO Stage 2 - Public Report - Artemis Intelligent Power Ltd

PTO stage 2 project summary report for the Artemis Intelligent Power Hybrid Digital Displacement® hydraulic PTO for wave energy project. Includes a description of the technology, scope of work, achievements and recommendations for further work.

View Details