Overview and Operations Review
A summary of the reports contained within the 5 work packages of Project Secure.
This is the Stage 1 summary report for the Quoceant Ltd QCS project.
Included within this public report is a high level overview of the activities completed on the during Stage 1.
Features include an overview of the scope of work completed, the project achievements, and the recommendations for future work, which indicate the proposed next steps in the development of this technology solution.
Project Keywords: Deployment, Installation, Moorings, Operations & Maintenance, Weather, Stage 1, Quick Connection Systems
A summary of the reports contained within the 5 work packages of Project Secure.
Set of reports detailing the sophisticated hydraulic power take off system used in the large scale Pelamis prototypes
Detailed reports on the mooring and connection system designed by Pelamis for their large scale prototypes
The PELs suite of custom Pelamis simulation software is covered in this set of reports
Conclusions and recommendations are given based on the Pelamis cost of energy modelling
Breakdown of build costs for key components within the Pelamis P2 wave energy converter, procured and built in 2010/2011.
Detailed breakdown of component costs within the PTO system of the Pelamis P2 machine procured in 2010, and tested over a number of years at EMEC.
The Pelamis machine included a novel system allowing rapid connect/disconnect from both the mooring system and electrical cable simultaneously. Cost breakdown for this system is given.
NWEC stage 1 project summary report for the Quoceant Automatically Inflatable and Stowable Volume (AISV) project. Includes a description of the technology, scope of work, achievements and recommendations for further work.
SMMP stage 1 project summary report for the Quoceant Advanced Concrete Engineering ‐ WEC (ACE‐WEC) project. Includes a description of the technology, scope of work, achievements and recommendations for further work.
This additional Controls documentation provides a condensed background description of Power Take Off modelling requirements, and Power Take Off specifications for control systems developers.
A summary of the Q-Connect technology, and the scope of work, outcomes, and next steps for development that were identified during Stage 2.