Stage
Stage 2
-
Project Lead
Tension Technology International Ltd
-
Project Sub-Contractors
Black & Veatch Ltd, University of Strathclyde, Quoceant Ltd, TTI testing, Optimus (Aberdeen) Ltd (1)
-
Author
Tension Technology International Ltd
-
Date
May 2020
The Stage 2 NetBuoy project encompassed two areas Tension Technology International Ltd (TTI) sees as being key to the path towards cost competitive wave energy – impermeable fabrics to provide compliant and thus load shedding/peak load resistant buoyant modules, and fibre rope ‘load nets’ to encapsulate the buoyant modules, applying distributed restraint loads and agglomerating the distributed load back to a single or number of structural points to connect to the other parts of the WEC system such as the PTO.
The medium-sized NetBuoy100 was ultimately chosen for more detailed engineering and cost assessment. This was benchmarked against a steel equivalent buoy to demonstrate the cost benefits and potential impact on LCoE (Levelised Cost of Energy), using the WES costing tool.
This team is currently undertaking a Stage 3 project.
Project Keywords: LCOE, Design Load Cases, Simulation, Fabrication, Survival, Structure, Testing, Point Absorber, Hybrid, Polymer, Materials, Stage 2, Lessons Learnt