Overview and Operations Review
A summary of the reports contained within the 5 work packages of Project Secure.
This report sets out the Pelamis experience with Cost of Energy (CoE) modelling, summarises the various tools developed and results obtained through the programme, and highlights the key insights it gave. It also draws conclusions and recommendations from the experience.
This report is written to provide insight into how the Pelamis models and projections moved and developed with time and with progress of the technology up the TRL scale. The information is captured here to provide assistance in assessing CoE projections for new or earlier stage technologies and to help ensure learning from this experience is realised.
An introduction and timeline of modelling techniques used, how they evolved into a comprehensive set of economic modelling tools as experience with real full scale machines was gained is given. This includes discussion on how initially optimistic projections become progressively more realistic. Also provided is a high level description for the primary set of economic modelling tools produced with and for utility partners and how they were validated with real machine data and the experience gained from them. The level of validation of the various inputs is summarised alongside the resulting error bounds. Where appropriate, this has been generalised to form a recommendation for confidence bounds in similar calculations.
Additional reports, documents and data files referenced here may not be publicly available.
Project Keywords: Economics, CAPEX, OPEX, TRL, Modelling, Pelamis Wave Power
A summary of the reports contained within the 5 work packages of Project Secure.
Details of the tank testing of scale models carried out during their extensive R&D work
Set of reports detailing the sophisticated hydraulic power take off system used in the large scale Pelamis prototypes
Detailed reports on the mooring and connection system designed by Pelamis for their large scale prototypes
The PELs suite of custom Pelamis simulation software is covered in this set of reports
A summary of the reports contained within the 5 work packages of Project Secure.
Set of reports detailing the sophisticated hydraulic power take off system used in the large scale Pelamis prototypes
Detailed reports on the mooring and connection system designed by Pelamis for their large scale prototypes
The PELs suite of custom Pelamis simulation software is covered in this set of reports
Breakdown of build costs for key components within the Pelamis P2 wave energy converter, procured and built in 2010/2011.
Detailed breakdown of component costs within the PTO system of the Pelamis P2 machine procured in 2010, and tested over a number of years at EMEC.
The Pelamis machine included a novel system allowing rapid connect/disconnect from both the mooring system and electrical cable simultaneously. Cost breakdown for this system is given.
NWEC stage 1 project summary report for the Quoceant Automatically Inflatable and Stowable Volume (AISV) project. Includes a description of the technology, scope of work, achievements and recommendations for further work.
SMMP stage 1 project summary report for the Quoceant Advanced Concrete Engineering ‐ WEC (ACE‐WEC) project. Includes a description of the technology, scope of work, achievements and recommendations for further work.
This additional Controls documentation provides a condensed background description of Power Take Off modelling requirements, and Power Take Off specifications for control systems developers.
A summary of the Q-Connect technology, and the scope of work, outcomes, and next steps for development that were identified during Stage 1.
A summary of the Q-Connect technology, and the scope of work, outcomes, and next steps for development that were identified during Stage 2.