A representative from each of the current projects gave a quick update on their progress up to December 2018, and their plans for future technology development

The file available to download combines the following presentations:

Project Progress Updates: Control Systems, Stage 2

  • MaxSim Ltd – Cost of Energy Optimisation by Reinforcement Learning
  • Queen Mary University – Adaptive Hierarchical Model Predictive Control of Wave Energy Converters
  • Wood – IMPACT – Integrated Marine Point Absorber Control Tool

Project Progress Updates: Structural Materials and Manufacturing Processes, Stage 2

  • Arup – Concrete as a Technology Enabler
  • CorPower – HydroComp
  • Tension Technology International – NetBuoy

Project Progress Updates: Novel Wave Energy Converter, Stage 2

  • 4cEngineering – ACER 2
  • AWS – Improved Archimedes Waveswing
  • Checkmate – Anaconda
  • Mocean – Mocean WEC

Project Progress Updates: Power Take-Off, Stage 3

  • Artimus – Quantor Hybrid Hydraulic PTO
  • Oceaneering – Power Electronic Controlled Magnetic Gear
  • Umbra – Electro-Mechanical Reciprocating Generator
  • University of Edinburgh – Project Neptune

Project Keywords: Attenuator, Ball Screw, Bulge Wave, Composites, Concrete, Linear Generator, Magnet, Hydraulics, Submerged Pressure Differential, Model Predictive Control, Reinforcement Learning, Algorithm, Polymer, Control Systems, Materials, NWEC, PTO, Stage 2, Stage 3

Other reports from this

Novel Wave Energy Converter - Stage 1 Guidance Documentation

These documents provide guidance for Stage 1 of the Novel WEC programme, outlining the overall competition guidance, supplementary guidance on the wave tank testing elements, the sea state conditions to be used for the WES Mandatory Performance Tank Testing, and the requirements for Third Party Verification of tank testing.

View Details

Novel Wave Energy Converter - Stage 2 Guidance Documentation

These documents provide guidance for Stage 2 of the Novel WEC programme, outlining the scope of requirements (suggested activities and expected outcomes) and a summary of the process and conditions to be used for the standardised sea states during the WES Novel WEC Stage 2 mandatory performance tank testing.

View Details

WES Update - EWTEC 2017

This presentation was given by WES at their side event during EWTEC 2017, and showcases programme developments, international collaborations, recently announced activities, and background to tank testing requirements.

View Details

ETP Update - EWTEC 2017

This presentation was given jointly by WES and the ETP (Energy Technology Partnership) at the WES side event during EWTEC 2017, and gives background on ETP, opportunities for funding and how it it interfaces with WES.

View Details