Back
European Wave and Tidal Energy Conference 2017 - WES Update

Contractor Project Updates


  • Project Lead

    Wave Energy Scotland Ltd

  • Project Sub-Contractors

    Artemis Intelligent Power Ltd, Ecosse Subsea Systems Ltd, Exceedence Ltd, Mocean Energy Ltd, Quoceant Ltd, Technology from Ideas Ltd, Wave Venture Ltd, Umbra Cuscinetti S.p.A., University of Edinburgh

  • Author

    Wave Energy Scotland Ltd

  • Date

    August 2017

This presentation was given by WES-funded contractors in attendence at EWTEC 2017 at the WES side event, and showcases their respective project progress to date.

Presentations were given on the following WES projects (presenters given in brackets):

  • Rotohybrid - Structural Materials, Stage 1 (Pelagic Innovation, on behald of University of Edinburgh)
  • Polyshell - Structural Materials, Stage 1 (TFI)
  • ACE-WEC - Structural Materials, Stage 1 (Quoceant)
  • Mocean - Novel Wave Energy Converter, Stage 2 (Mocean)
  • Gator - Power Take-Off, Stage 2 (Exceedence)
  • PECMAG - Power Take-Off, Stage 2 (Pure Marine, on behalf of Ecosse Subsea)
  • Quantor - Power Take-Off, Stage 3 (Quoceant, on behalf of Artemis Intelligent Power)
  • EMERGE - Power Take-Off, Stage 3 (Umbra)
  • ARMOR - Structural Materials, Stage 1 (Wave Venture, on behalf of Haydale Composite Solutions)
  • HydroComp - Structural Materials, Stage 1 (Wave Venture, on behalf of CorPower)
  • ARMWET - Structural Materials, Stage 1 (Wave Venture, on behalf of PolyGen)

Project Keywords: Materials, NWEC, PTO, Stage 1, Stage 2, Stage 3, Presentation, Ball Screw, Composites, Concrete, Elastomer, Hydraulics, Linear Generator, Magnet, Point Absorber, Polymer, Rotational Moulding, Attenuator

Other reports from this

WES Update - EWTEC 2017

This presentation was given by WES at their side event during EWTEC 2017, and showcases programme developments, international collaborations, recently announced activities, and background to tank testing requirements.

View Details

ETP Update - EWTEC 2017

This presentation was given jointly by WES and the ETP (Energy Technology Partnership) at the WES side event during EWTEC 2017, and gives background on ETP, opportunities for funding and how it it interfaces with WES.

View Details

Novel Wave Energy Converter - Stage 1 Guidance Documentation

These documents provide guidance for Stage 1 of the Novel WEC programme, outlining the overall competition guidance, supplementary guidance on the wave tank testing elements, the sea state conditions to be used for the WES Mandatory Performance Tank Testing, and the requirements for Third Party Verification of tank testing.

View Details

WES Update - EWTEC 2017

This presentation was given by WES at their side event during EWTEC 2017, and showcases programme developments, international collaborations, recently announced activities, and background to tank testing requirements.

View Details

ETP Update - EWTEC 2017

This presentation was given jointly by WES and the ETP (Energy Technology Partnership) at the WES side event during EWTEC 2017, and gives background on ETP, opportunities for funding and how it it interfaces with WES.

View Details

Ocean Energy Stage Gate Metrics Validation Workshop

This report presents the results from a workshop held to validate a set of stage gate metrics for ocean energy technology development programmes. This workshop is the third in a series of workshops which form part of an ongoing collaboration in defining stage gate metrics. This was delivered by Wave Energy Scotland on behalf of and funded by the OCEANERA-NET.

View Details

Novel Wave Energy Converter - Stage 2 Guidance Documentation

These documents provide guidance for Stage 2 of the Novel WEC programme, outlining the scope of requirements (suggested activities and expected outcomes) and a summary of the process and conditions to be used for the standardised sea states during the WES Novel WEC Stage 2 mandatory performance tank testing.

View Details